The Deputy Chief Engineer (Bridge/Line), North Central Railway, Agra invites e-tenders for railway bridge infrastructure modifications. The project covers the balance work for reconstructing a 2-lane road overbridge (ROB No. 157). The work includes increasing the height and rebuilding the old structure between Agra Fort and Idgah stations. The total approximate cost for this engineering contract is estimated at ₹6,74,75,474.59. Portal submissions close on August 5, 2026, at 3:00 PM via ireps.gov.in.